News of group

27.12.2023

SUCCESSFUL DRILLING OF WELL No. 7 GRABYNSKA


GEO-NADRA-INVEST LLC has successfully completed drilling and testing of well No. 7-GRABINSKA Drilling of well No. 7 at Grabinska began in November and was completed in December 2023. Based on the results of the well tests, an industrial gas inflow was obtained.



Back to the list