News of group
12.03.2023
The Dibrova-16 well was successfully drilled
Within the framework of the URP project, the Dibrova-16 well was successfully drilled within the framework of the PSA project
12.03.2023
Within the framework of the URP project, the Dibrova-16 well was successfully drilled within the framework of the PSA project