News of group

19.07.2021

DISCOVERY OF THE PIDHIRTSI GAS FIELD


GEO-TOPO-CADASTRE PE has successfully completed drilling and testing of well No. 2-PIDGIRTSIVSKA. Drilling of well No. 2 Pidhirtsiivska with a depth of 2300 m began in June and was completed in July 2021. Based on the results of the well tests, an industrial gas inflow was obtained.



Back to the list