News of group

10.04.2019

Opening of the Rudnikov gas field


In April 2019, PE "Proekt-Bud" opened the Rudnikov gas field. Drilling and testing of well No. 3 -RUDNYKIVSKA was successfully completed. Drilling of well No. 3 Rudnikovska with a depth of 1,104 m began in March and was completed in April 2019. According to the results of well tests, an industrial gas flow was obtained



Back to the list