News of group Zakhidnadraservis Group is the General Partner of the All-Ukrainian Award "Power of Influence&q... 13.12.2024 On December 13, the All-Ukrainian "Power of Influence" Award honored the exceptional contributions o... Well drilling 16.01.2024 In January 2024, the Company started drilling two wells, namely: Hrabynska No. 8 exploratory well at... Modern high-tech 3D seismic survey 11.01.2024 GEOROZVIDKA LLC, using a wireless seismic data acquisition system, conducted 3D seismic surveys acro... Rudnykivska No. 14 exploratory well 09.01.2024 Rudnykivska No. 14 exploratory well was successfully drilled. Drilling was performed by DRILLING COM... SUCCESSFUL DRILLING OF WELL No. 7 GRABYNSKA 27.12.2023 GEO-NADRA-INVEST LLC has successfully completed drilling and testing of well No. 7-GRABINSKA Drilli... TERSHAKIVSKE GAS FIELD PUT INTO PILOT COMMERCIAL DEVELOPMENT 27.09.2023 Production Sharing Agreement dated 31.12.2020 No7 - investor (operator) LIMITED LIABILITY COMPANY "W... COMMISSIONING OF WELL NO. 13 RUDNYKOVSKAYA 05.09.2023 Well No. 13 - RUDNYKOVSKAYA was put into trial operation in September 2023. COMMISSIONING OF WELL NO. 16 DIBROVSKAYA 25.07.2023 Well 16 - DIBROVSKAYA was put into trial operation in July 2023. The Tershakivska-10 well was put into operation 04.07.2023 As part of the Ugnivska PSA, the Tershakivska-10 well was put into operation COMMISSIONING OF WELL NO. 6 GRABINSKA 03.07.2023 Well 6 - GRABINSKA was put into trial operation in July 2023. SUCCESSFUL DRILLING OF WELL No. 13 RUDNYKOVSKAYA 17.05.2023 PE "Project-Bud" has successfully completed drilling and testing of well No. 13-RUDNYKOVSKAYA. Dril... SUCCESSFUL DRILLING OF WELL No. 16 DIBROVSKAYA 19.04.2023 Drilling of well No. 16 DIBROVSKA with a depth of 1809 m began in February and was completed in Apri... OPENING OF UGNIVSKA SQUARE 5 (TERSHAKIVSKA) 05.04.2023 Production Sharing Agreement No. 7 dated 31.12.2020 - Investor (Operator) WELL CO LIMITED LIABILITY ... The Dibrova-16 well was successfully drilled 12.03.2023 Within the framework of the URP project, the Dibrova-16 well was successfully drilled within the fra... SUCCESSFUL DRILLING OF WELL NO. 9 GRABINSKA 28.02.2023 GEO-NADRA-INVEST LLC has successfully completed drilling and testing of wells No. 9-GRABINSKA. Drill... COMMISSIONING OF WELL NO. 9 GRABINSKA 21.12.2022 Well No. 9 - GRABINSKA was put into trial operation in March 2023. COMMISSIONING OF WELL NO. 12 DIBROVSKAYA 08.12.2022 Well 12 - DIBROVSKAYA was put into trial operation in December 2022. SUCCESSFUL DRILLING OF WELL No. 12 DIBROVSKAYA 10.10.2022 Drilling of well No. 12 DIBROVSKA with a depth of 1252 m began in September and was completed in Oct... COMMISSIONING OF WELL NO. 11 DIBROVSKAYA 15.06.2022 Well 11 - DIBROVSKAYA was put into trial operation in June 2022. SUCCESSFUL DRILLING OF WELL No. 11 DIBROVSKAYA 18.05.2022 Drilling of well No. 11 DIBROVSKA with a depth of 1210 m began in April and was completed in May 202... Back 1 2 3 Next